Journal Entry 2
Project B » Devlog
Date: 1.4.2023
Activity:
- Implemented the piston section (2h)
- Implemented custom piston logic (1h)
- Played with variables to match design (1h)
- Playtested the level and fixed minor issues (1h)
I have completed the basic construction of the level. I tried to adhere to my origininal design as close as possible, with some small exception (I took a bit of liberty with the piston section, i had to add a checkpoint because the level does not revert to its original state when player respawns). Other than that the level is the same, although I think I will need to make some changes after playtesting.
Time: 3h (this week, 11 on project b in total)
Outcome: Attached draft project b implementation